workshop inconsistencies v04

I worked with my school colleagues at this workshop.

(from website)

“This is by far the largest prototypical model built in the Inconsistencies series. It was built at Kula Nebojsa in Belgrade in June this year, as a result of the workshop conceived as an integral part of the Design Studio curriculum 1112M5 for 16 students at University of Belgrade. There are several key aspects to this exercise. The model was built in the open air space, to interact with weather conditions over the period of few weeks. Elastic material behavior was a key to construction process. A custom made plug-in was developed for Rhino to allow for geometric modeling with material constraints. Construction of the model is carried out as a collective effort, according to the design protocol structured as a set of simple rules based on easy to do techniques (never mind the baking sun and five meter distance to the concrete floor)”

 

source:

http://blog.4ofseven.com/1112m5/1112m5-inconsistencies-v0-4/

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s